I got the E brake cable bracket welded to the floor ,the rear seat brackets ,and the seat side panel brackets welded in .I finished welding the trany mount brace to the trany tunnel .I just have the trunk drop off and the lower part of the driver quarter and the two roof patches and the welding will be finished .
.I decided i could at least drill the lowering holes in the spring towers .I started to scribe the lines when i thought
You need a template .So i found some scrap 1/4 inch plate steel and made a template