My 65 fastback has some rust in the frame rails, being as I`m installing a V-8 from a 6 cyl, I think I need to add some steel to the rails. We are gonna cut out the rust and put new steel in its place.:SNSign:
We are adding subframe connectors and we have cut some 1/4 inch steel plate to weld onto the existing frame rails, has anyone out there tried this? What do I need to watch out for, I`m not a welder, but my buddy doing it is, we are using a mig welder.
We are adding subframe connectors and we have cut some 1/4 inch steel plate to weld onto the existing frame rails, has anyone out there tried this? What do I need to watch out for, I`m not a welder, but my buddy doing it is, we are using a mig welder.
