Im trying to instlla my bassani 1 5/8''- 1 3/4'' stepped longtubes and they are basically fighting me the whole way. dunno what im doing wrong but if anyone knows what tubes have to go on first and if i should put the 4 tubes in and then bolt them all down or bolt them down one at a time?
whtpny
New Member
I have not dealt with the Bassani but I would suggest that you put all the tubes in loose as you can so they stay on then as you get it aligned you can tighten them up. You can also jack the motor up for more room. I am not sure on the stepped headers if you need to lower your steering shaft to get the required room.