I'm replacing my rear footwell after the previous owner patched it (poorly) and I can't tell if the original one was welded between the torque box or on top of it.
If i had to guess I'd say it goes over the top because I can see a step in the seat floor sheet metal where it appears the footwell goes under it (and over the torque box).
Can someone tell me if I need to split the torque box or if the footwell goes over the top of it?
Also, what gauge sheetmetal should I use to patch the torque box? It has some rust but not enought to cut out the whole assembly and start over.
Thanks!
If i had to guess I'd say it goes over the top because I can see a step in the seat floor sheet metal where it appears the footwell goes under it (and over the torque box).
Can someone tell me if I need to split the torque box or if the footwell goes over the top of it?
Also, what gauge sheetmetal should I use to patch the torque box? It has some rust but not enought to cut out the whole assembly and start over.
Thanks!