So I stripped the car down and on tap for repair are:
1) Both Front floor boards (just the front piece), seat pans and toe boards
2) Both frame rail floor supports
3) Replace Torque box (drivers side) and put in a TB on Pass side
4) Replace floor board crossmember
I would like suggestions on the sequence of performing the work.
Also, can I do this on the rotisserie or does it need to be on Jack stands
1) Both Front floor boards (just the front piece), seat pans and toe boards
2) Both frame rail floor supports
3) Replace Torque box (drivers side) and put in a TB on Pass side
4) Replace floor board crossmember
I would like suggestions on the sequence of performing the work.
Also, can I do this on the rotisserie or does it need to be on Jack stands