I've got what is probably an overly simple question, but I need to get it right in my mind before I start my gear install tonight. When I read about setting the preload on the pinion gear, what I envision is that I'm supposed to tighten the pinion nut by hand (aka, a breaker bar), then once there is no front to back "play" on the pinion gear, start checking the preload with the in/lb torque wrench. And by preload what is meant is the amount of in/lb force it takes to turn the pinion gear with the torque wrench and socket on the pinion nut. Right? What I seem to keep second guessing is that once I tighten the nut that much it will already by way more than 16-29 in/lb. Can someone talk me down from the ledge on this one? I feel pretty confident I can do the overall job, but I'm the type that has to know EVERYTHING before I start or I get nervous.
Thanks!!
Thanks!!