SILVER mustangs: in here!

  • Sponsors (?)


Im not sure LOL. Well the drivers header i still at the tig welders house...and seems to be almost done. After we get that back we can boltup into place, the while drivers side system.
Then we have to tack togethor the pass header (about 6 hours of work at max) and take it to the guy for tigging. Get that back and assyemble the other side. (fast) and BAMO...DONE!

Well drive it until I use up most of the fuel and then we can drop the tank. Gas is full right now, so dropping the tank will probably be diffacult.
 
jivepixar.jpg