Nate
Its been so long ago but to the best of my memory, here is what I did on E7's
Reduce the I vg by about half its original size. You can shape it kinda like a tear drop to help air flow btw.
Take the E vg down flush with the roof
Take the thermactor bump down flush with the roof
Raise the E port roof a good bit. IIRC, mine were close to straight with very little dip in the roof.
Widen the E port a good bit
Don't hose around with the floors of either ports
Don't touch the short turn radius
Smooth the bowl transitions to the ports
Polish the chambers
If using the stock valves, have them back cut for a bit more flow
Just work on the first I & E port, bowl, & chamber until you are satisfied.
Take measurements, make notes, etc and then
Just do that same thing seven more times
Trust me ... Lotta Work
Ain't worth it to me
Grady