• Mustang Forums
  • 2005 - 2014 S-197 Mustang -General/Talk-
  • 2005 - 2009 Specific Tech

Long Lead O2 Sensors

  • Thread starter Thread starter subvett
  • Start date Start date May 25, 2023
S

subvett

5 Year Member
Jul 14, 2018
7
2
13
Connecticut
May 25, 2023
#1
  • May 25, 2023
  • #1
2009 Mustang with LT headers (Ceramic Coated) and Supercharger. I continue to throw P0133/P0153 (Slow O2 Sensor Response) codes. I know this is common and seems to be due to relocation of the sensors further back. Symptom, start car and drive for a bit. No codes. Stop for a period of time and take off again. Shortly after codes pop. Still testing this theory, but it seems if I let the car idle for awhile the code does not come in. I have been watching O2 Sensor Voltage to determine length of idle time. I know these codes can be caused by faulty sensor, faulty wiring, or exhaust leaks under stock apllications. I have tried adjusting Transport Delay and am currently at 25% higher than stock and still throw codes. My questions are:

1. Does anyone have a permanent fix for this?
2. Is there an O2 Sensor with longer leads that work in this application allowing me to get rid of the O2 sensor lead extension?
3. Any other thoughts.

Thanks in advance.
 
You must log in or register to reply here.

Similar threads

A
P0036 P0056 P0137 P0157 2020 Ford Mustang GT
  • AmkoA
  • Jun 16, 2026
  • 2024+ (S650) Mustang -General/Talk
Replies
0
Views
271
2024+ (S650) Mustang -General/Talk Jun 16, 2026
AmkoA
A
Engine Keeping O2 sensors lit with long tube headers
  • keel
  • Jul 30, 2026
  • Fox 5.0 Mustang Tech
Replies
4
Views
246
Fox 5.0 Mustang Tech Aug 21, 2026
Qtrhrse23
I
Engine Help requested in identifying how to resolve engine light issue
  • Ianslaney
  • Oct 4, 2026
  • SN95 4.6L Mustang Tech
Replies
1
Views
158
SN95 4.6L Mustang Tech Oct 4, 2026
Bullitt347
Engine Random Misfire at idle.
  • Gulftown980x
  • Jul 29, 2026
  • SN95 4.6L Mustang Tech
Replies
11
Views
560
SN95 4.6L Mustang Tech Jul 31, 2026
squeak93
G
2006 Mustang GT o2 Sensor Wiring Issue Car Bogging/Choking
  • GCantero93
  • Sep 5, 2025
  • 2005 - 2009 Specific Tech
Replies
4
Views
1K
2005 - 2009 Specific Tech Sep 6, 2025
Noobz347
Share:
Bluesky Email Share Link
  • Mustang Forums
  • 2005 - 2014 S-197 Mustang -General/Talk-
  • 2005 - 2009 Specific Tech
Menu
Log in

Register

  • Forums
  • What's new
  • Media
  • Resources
  • Contact
  • Sponsor
X

Privacy & Transparency

We use cookies and similar technologies for the following purposes:

  • Personalized ads and content
  • Content measurement and audience insights

Do you accept cookies and these technologies?

X

Privacy & Transparency

We use cookies and similar technologies for the following purposes:

  • Personalized ads and content
  • Content measurement and audience insights

Do you accept cookies and these technologies?