Ok well when i figured out that my little 4 banger motor was done for, i decided to pull it out and start my engine bay work. After i got it all pulled and was lookin at all of it, i wanted to do some wiring hiding and some smoothing. Im running carb so i was able to pull all the wires from the computer out, and in the process i decided not to run AC any more, so i was able to pull the entire harness out of the firewall, on the passenger side. That alone made is so much better and cleaner lookin. I wanted to weld up all thwe holes and then grind them down and paint, over but i decided im gonna sheet metal inside the engine bay, and then paint over it all. I still had some wires on the driver side fender and on the front hood latch support beam, i ran the harness into the fender well and made it look real clean, and for the wires on that beam support, i cut them slid them inside the beam, completly consealed from the eye, and and pull the through a hole, resoldered them and then pushed them back inside. Afetr all that i have no wires showin in the bay. I think it looks tons better, I startered making my cardboard templates for my sheetmetal, so i can save some time when i got to my dads shop. I have the car up a a 2 post lift right now, with the entire front end: k-member, a-arms, sway bar, everything pulled out of the car. Im waiting for my new tubular k-member, tubular a-arms, coilover, BBK C/C Plates to arrive on friday. Once thats gets it, will come off the lift and to the fabrication shop. Here are some pics of the cars progress, tell me wat ya think so far....
This Friday i am hoping to get my k-member in earlier that day so i can get it all done, so i can take it to my dad Fabrication shop on Saturday and do all my sheetmetal work there. Should look pretty nice when its done. I will post more progress once i get more done, shoudl be this Friday if UPS tracking is accurate.
This Friday i am hoping to get my k-member in earlier that day so i can get it all done, so i can take it to my dad Fabrication shop on Saturday and do all my sheetmetal work there. Should look pretty nice when its done. I will post more progress once i get more done, shoudl be this Friday if UPS tracking is accurate.
Attachments
-
dsc00740jr6.th.webp7.8 KB · Views: 158 -
dsc00738he4.th.webp15.2 KB · Views: 162 -
dsc00739vy5.th.webp14.5 KB · Views: 167 -
dsc00733ou3.th.webp12.4 KB · Views: 166 -
dsc00735xv1.th.webp15.5 KB · Views: 176 -
dsc00736jv2.th.webp14.2 KB · Views: 168 -
dsc00727pe5.th.webp13.7 KB · Views: 165 -
dsc00730sn3.th.webp15.9 KB · Views: 145 -
dsc00731xs0.th.webp14 KB · Views: 162

