Expected it today, but the seller didnt have the paperwork ready. Says he will get it taken care of tonight and tommorrow morning. I really hope so, its two weekends, that have gone by where I couldnt start cleaning it up. So if all goes well tommorrow I will own my first stang. Its a 2001 GT Convertible, triple white, 67k, pretty much stealing it for $7500. Its got a little bit of a noise coming from the rear, I`m going to change the diff fluid, have the brakes turned, probably get a set of green stuff pads, do a tune up and fluid change, and see how she does. It needs a cleaning pretty bad, but should clean up nice. I`m excited, but I dont plan on doing any mods until I get the mini paid off, which if all goes well, should be about 4 months. I really am on the fence about doing a full exhaust on it. The two sticky points for me is the difficulty of installing long tubes, and if I want the extra noise on a rag top. Thoughts?
I was wondering that too.
let us know how it goes