Progress Thread Komo's 1990 GT - Parts Gathering Purgatory & Home Remodel

Car cover is already failing. San Diego sun can be brutal!

IMG_1665.webp

Thankfully only a little longer before she’s back in the garage.
I have not had good luck with " temporary" covers ever... One good thunderstorm in Florida did this.... The mustang made in through unscathed, I got lucky ....
DSCF1706.webp
DSCF1747.webp
 
Haha, when life gives you lemons you cry in the closet.

Not sure if it’s making national wide news but we here in SoCal have been getting hit with some decent weather/rainfall. Well, construction company (was actually the stucco company) masked off the house for final stucco starting early next week. Well, they also masked off the deck drain off our master bedroom and last night when we had heavy rain it basically turned into a mini pool that then overflowed through the door into our master bedroom. Master Bedroom, part of the master bathroom, entry way ceiling and walls, 70% of the living room floors, 40% of our kitchen floors, who knows what other walls are affected all got flooded/wet.

Big f’n problem that sets us back probably another month if not more. What a day.
 
Haha, when life gives you lemons you cry in the closet.

Not sure if it’s making national wide news but we here in SoCal have been getting hit with some decent weather/rainfall. Well, construction company (was actually the stucco company) masked off the house for final stucco starting early next week. Well, they also masked off the deck drain off our master bedroom and last night when we had heavy rain it basically turned into a mini pool that then overflowed through the door into our master bedroom. Master Bedroom, part of the master bathroom, entry way ceiling and walls, 70% of the living room floors, 40% of our kitchen floors, who knows what other walls are affected all got flooded/wet.

Big f’n problem that sets us back probably another month if not more. What a day.
Hope they get you straightened out man. I cant imagine blocking a drain, or drains, and not checking the weather first. Granted the weather isn't always right, but friggin A man, maybe cover the drains the day of work. :bs:
 
Well, we rented another place until November 14th just to be safe (on their dime, of course). Mold testing is happening early next week, our decision… they weren’t planning on doing it…? They didn’t rip out the upstairs floors for 4 days after the incident because “the floors showed dry on the moisture meter”… we bitched just due to water hitting the floors and I confirmed with the flooring company it voids their warranty for things that ARE covered… low and behold the subfloor was soaked, my hand got wet just by touching it.

They brought on a new project manager because we expressed concerns about the one we had this whole job… we just feel like he’s trying to hide stuff to keep the job moving forward. There’s been other things along the way so here we are, with a new PM overseeing the job. Thank goodness our jobs have allowed us to be on site more and see things and bring up issues that probably never would have been brought up without us there. Or I’m gonna get fired for basically working part time the last few months…
 
I have a plan... O_o


Me, @limp , and @rednotch , will take turns monitoring workers during the day.

Why? Because we're very comfortable with the tactical use of the F word on aholes that desperately need it.

We may include @General karthief if we need to deploy a 'good cop' before the mushroom cloud hits.

Question: Do you possess enough property for a couple shallow graves?
Just 'gee-wiz' info. :chin How do you feel about roses?
 
  • Haha
  • Like
Reactions: gkomo and rednotch
Haha man I need some backup muscle for sure! Shallow graves, I’ll just use their dump trailer, they can deal with their own!

The new PM is cool, he’s been around a couple different times when things have gotten tense. We’ve had more than a handful of onsite meetings with our old PM, the new PM, senior PMs, and even the owners of the company all together. One of the owners even said they are losing money on this job… cool, not my problem (he’s also my wife’s work client so probably didn’t mean that in a bad way towards us). The company is one company but he owns/runs the real estate side of it then there is another owner who runs the construction side of it. So my wife’s client is cool and nice and has been helpful having an ‘owner’ presence but he’s not like ‘involved’ in the job itself.

My brother and his family are visiting from NorCal, they came by and I showed them the house. At least everyone says it’s GONNA be cool, whenever that may be.
 
I would think if it's a large company they would have insurance that probably covers this type of stuff, or can take a loss like this. Maybe pay for a set of Smoothie Rims and chrome caps.
The fact that you can monitor the situation likely saved a situation later.
 
  • Like
Reactions: gkomo
At the house every day at some point. November 25th is the new move in date... based on the schedule it seems like the interior stair railing is the long pole in the tent. Replacement floors are almost all done, replacement drywall is done, just needs interior paint.

Then there's like a ton of little :poo: that i'm like why isn't this stuff done. Door handles, vanity lights, shower doors half installed, etc etc etc.

Exterior is being painted this week (not through the construction company)... first coat of the 'house' color went on today. White Dove for the house, Chantilly Lace for the trim, Rocky River for the front door.

Thankfully they are paying for our current living situation (yes we had to move again) due to the water damage situation.

IMG_2329.webp
 
Forgot to mention... haha (this job just keeps on giving). So we had the first 'flood' after the big mid October rainstorm as i mentioned above.

THEN, two weeks later we had a smaller rainstorm and the french door off our kitchen/living room to our side yard had the door sill (which means the water channel) taped up to protect it from damage, a small amount of water, but nonetheless water, came in and damaged like 2 or 3 planks in front of that door which is the opposite side of the living room from the original damage.

THEN, they said when they turned the water on there was a leak at a fitting under our kitchen sink that 'flooded' our whole sink area including subfloor and cabinetry. The kitchen was off limits as we had just had it redone like 4 years ago so they are saying it wasn't their fault. I was there when they turned the water on again and it was like shooting out of this fitting. HOWEVER, their electrician was under there because they did replace every electrical line and outlet in the entire house. Guess what was right above the line that leaked? An outlet being replaced. I know for a fact that there was no leak prior to us moving out - they tried to say 'oh maybe you just didn't notice'.... no bro, the line that leaked was for a water filter system and i date my filters (this one was last replaced 9/27/25) AND we have one of those Kangan water machines under there that requires daily 'cleaning cycles' where you have to actually open the cabinets, press a button for it to do its cleaning thing, and switch the mode back to normal.... so every day i was under the sink for some reason or another. Anyways, we can't prove it, but i'm almost 100% certain the electrician inadvertently yanked on the filter line (the one that was leaking) causing the leak.

Long story short, they ripped out ALL the floors in the living room and kitchen because of the two leaks that were their fault. Just this morning i was back at the house on my way to work and the floors are 98% reinstalled. But, this kitchen sink leak is costing us roughly $4k to repair (by a third party contractor). We had a water remediation company come in and they found mold under our dishwasher, although the dishwasher wasn't leaking itself... just in the path of the sink leak. So we ripped everything out and had it remediated. The company rebuilding our cabinets and all that started today.

IMG_0953.webp
 
Last edited:
Wife wanted a new refrigerator, dishwasher, and couch (for now). All those are on order with expected delivery date of the 17th.

We will use our existing refrigerator as a new 'garage fridge'. Our old dishwasher was perfectly fine but because it was 'near the mold' she wants it gone. Shes sort of a hypochondriac in that way.

We still need to buy so much stuff... night stands, a bedframe, whole master closet 'system' (I think i'm just going to do IKEA for that), coffee table, entertainment center chest, audio cabinet (more me than her), an under sink reverse osmosis water filtration system, she wants all new dishware, bath towels, etc. etc. etc.

We still have landscaping, a new driveway, 'finishing touches' on the house (potted plants, etc.), i want a new quieter garage door motor.

We had our fireplace tiled with some damn expensive tiles and still need a mantel. Moving back in will just be the start haha


IMG_2372.webp

IMG_2373.webp

Weird, the second photo makes the room look smaller. Maybe my phone camera was on a weird setting. Its much bigger (thankfully) standing there in person.
 
For a Kitchen RO system I installed a 4 stage system from https://www.waterfiltersonline.com, the first one on the page foe RO's. Since the water here from DWP is fairly good, I just had to replace the membrane this year after 9 years of service and only change the filters once a year. They have everything you need to keep it maintained, TDS tester, correct filter wrenches, etc.. Just food for thought since your mechanically inclined. ;)
 
For a Kitchen RO system I installed a 4 stage system from https://www.waterfiltersonline.com, the first one on the page foe RO's. Since the water here from DWP is fairly good, I just had to replace the membrane this year after 9 years of service and only change the filters once a year. They have everything you need to keep it maintained, TDS tester, correct filter wrenches, etc.. Just food for thought since your mechanically inclined. ;)
Excellent, thank you!

Just need to verify i have the space for the 17" High X 14" Wide X 6" Deep dimensions of the system. My garbage disposal is pretty massive.