Ok about to install the new engine with the specs found in my sig. I am making up a check sheet of all the things to be done for the install. Add what you see missing.
5quarts dino oil
1Gal rad fluid
8 Champion plugs (recomended by Edelbrock for their heads)....gaped at .54??
Motor goes in first with cherry picker and matted to tranny.
Motor mount tightened.
Injector orings lubed and placed in fuel rail and rail replaced into position.
Hook up fuel rails..bolt down fuel rails.
injector harness hooked up and all coresponding sensors.
battery replaced and hooked up.
Turn on and off ignition several times to inspect for fuel leak.
install upper and vac lines/ coolant lines.
Fill rad to top.
fill engine 5qts dino oil.
pull distributor and run drill in reverse on pump shaft to prime system untill oil comes out rockers and pushrods.
Turn crank by hand two revs back to TDC.
replace dist.
install spark plugs.
start engine..listen watch..
Ok this is my check list add any tips you can think of for me...Thanks guys,
Derek.
5quarts dino oil
1Gal rad fluid
8 Champion plugs (recomended by Edelbrock for their heads)....gaped at .54??
Motor goes in first with cherry picker and matted to tranny.
Motor mount tightened.
Injector orings lubed and placed in fuel rail and rail replaced into position.
Hook up fuel rails..bolt down fuel rails.
injector harness hooked up and all coresponding sensors.
battery replaced and hooked up.
Turn on and off ignition several times to inspect for fuel leak.
install upper and vac lines/ coolant lines.
Fill rad to top.
fill engine 5qts dino oil.
pull distributor and run drill in reverse on pump shaft to prime system untill oil comes out rockers and pushrods.
Turn crank by hand two revs back to TDC.
replace dist.
install spark plugs.
start engine..listen watch..
Ok this is my check list add any tips you can think of for me...Thanks guys,
Derek.