So... How far are you taking this?
What do you have in mind?
Where is your list of "

to do"?
There's definitely a list.
Chassis: K-Member, control arms, coilovers front and rear, fix floor rot, POR any spots that don't need new metal.
Brakes: all new lines, ABS, hydro boost, recondition the M2300 calipers
Interior: complete refit, RTX gauge cluster, modern stereo, lose the A pillar gauges
Engine: clean it, fix any leak points, new cooling system, refit OE aircon, 24lb injectors, replace broken fuct wiring harnesses, 3G alternator, Cobra intake, long tubes, Borla catback
Transmission: clean and reinstall. Keep the B&M shifter.
IRS: a couple of MM parts, replace pinion seal.
Cosmetic: clean/repaint engine bay, the general exterior gets a gentile refresh. Not perfect, but pretty.
Its a lot. But it's gonna be good.