1965 Fastback with DSE

rusty428cj

10 Year Member
Sep 29, 2007
921
216
84
Port Richey Fl
We will be installing DSE mini tubs, subframe connectors, front and rear suspension in this 1965 Fastback.
This is what we are starting with.





The first step is to remove the undercoating before it goes to get media blasted. I have never seen so much undercoating.



You never know what you will find under the paint





 

Attachments

  • 01.jpg
    109.3 KB · Views: 304
  • 10.jpg
    119.2 KB · Views: 274
  • 07.jpg
    192.5 KB · Views: 270
  • 19.jpg
    108.2 KB · Views: 244
  • 23.jpg
    98 KB · Views: 265
  • 25.jpg
    93.5 KB · Views: 255
We have repairs to do before we install the DSE mini tubbs.

The front crossmember had been hit so we replaced it



Before we installed the new one Brian cleaned up the surface rust than brushed a coat of SPI epoxy





The left front apron has a little rust so Brian cut it out







There was also a little rust on the firewall. After drilling out the spot welds on the fender apron Brian patched it.







 

Attachments

  • 31.jpg
    101.5 KB · Views: 255
  • 34.jpg
    102 KB · Views: 270
  • 36.jpg
    109.6 KB · Views: 251
  • 38.jpg
    102.9 KB · Views: 282
  • 39.jpg
    110.4 KB · Views: 248
  • 41.jpg
    95.2 KB · Views: 259
  • 42.jpg
    105.1 KB · Views: 278
  • 43.jpg
    91.3 KB · Views: 246
  • 44.jpg
    114.7 KB · Views: 252
  • 45.jpg
    109.1 KB · Views: 255
Both quarter panels need to be replaced.



After they were removed everything was epoxy primed



Lining up the new trunk floor



 

Attachments

  • 50.jpg
    132.4 KB · Views: 258
  • 51.jpg
    106.6 KB · Views: 240
  • 57.jpg
    106 KB · Views: 286
  • 58.jpg
    125.5 KB · Views: 260
Brian wanted to fit the mini tubs before installing the quarter panels the first thing he did was cut out the frame rail to make room for the new one that come in the kit.





These braces come with the kit



This is what needs to be cut out for the new mini tub. You can go in 2" or 3" we chose 2" because in you go 3" you have to narrow the supplied frame rail 1"

 

Attachments

  • 63.jpg
    121.2 KB · Views: 272
  • 64.jpg
    110.1 KB · Views: 267
  • 65.jpg
    120.4 KB · Views: 286
  • 66.jpg
    124.4 KB · Views: 273
Reactions: 1 user
I'm sorry I have forgotten to update

Test fitting the mini tub and quarter





Epoxy primed the inside of the quarters



Installing the DSE mini tubs





Roll bar installed before the quarters





Couple of coats of SPI epoxy





Quarters and taillight panel installed

 
Front cradle bolted in place and new DSE front mounts welded in place of the stock sway bar mount



Holes drilled in frame



Crush tubes that go in the frame



Crush tubes bolt to the upper mount and will be welded to the frame





Top bracket plug & tack welded in place



 
You have to weld a snubber bracket to the frame rail





Crush tubes welded in place





Starting to fabricate a brace. DSE leaves the stock strut rod brackets but I like this better plus it gives you somewhere to place a jack.