As I am sure all of you are aware it is close to that time of the year to start with the winter projects. I have chose to start on mine now. In for store this winter is QA1 entire front end setup, k member, a arms, coilover front suspension setup and new caster camber plates, I am putting a ford 9 inch in the rear as tubular upper and lower control arms, Got a aluminum driveshaft i am putting in it and a TKO 600 transmission. For the finale I am switching my 347 stroker motor fuel injected setup to a 351w to 427 stroker carb setup with procharger. I am also cleaning up the engine bay when I have the engine out and the underneath side of the car when the rearend comes out. Sumping the fuel tank as well and running new lines. Will have progress pics posted as often as possible. Hoping to have it done in 3-4 months. Got some starting pics to post up this weekend to kick it off right. Look forward to hearing comments and suggestions from everyone.