Started hitting a "one project per week" discipline a few weeks back, and it is keeping me on track so far. In the past month I have:
* Rebuilt and balanced the driveshaft, including a new yoke due to wear.
* Re-installed the transmission. Fully detailed case and rebuilt shifter, and a new mount.
* Installed rear anti-sway bar
* Re-installed the rear glass and new stainless molding (repo fit perfectly!)
* Installed new Flaming River steering box and rebuilt the front steering
* Rebuilt the emergency brake system, blasting all parts to metal and re-assembling. I need only the rear cables to be installed to complete.
This weekend I am to install the gas and fuel lines, and bleed the brake system. That will free up my lift for the other cars. My engine is currently being spec'd at Steen racing and I will post the specs when they are finalized.
Almost home....
http://groups.msn.com/Steves65Mustang22Restoration/fewupdatedphotos.msnw
* Rebuilt and balanced the driveshaft, including a new yoke due to wear.
* Re-installed the transmission. Fully detailed case and rebuilt shifter, and a new mount.
* Installed rear anti-sway bar
* Re-installed the rear glass and new stainless molding (repo fit perfectly!)
* Installed new Flaming River steering box and rebuilt the front steering
* Rebuilt the emergency brake system, blasting all parts to metal and re-assembling. I need only the rear cables to be installed to complete.
This weekend I am to install the gas and fuel lines, and bleed the brake system. That will free up my lift for the other cars. My engine is currently being spec'd at Steen racing and I will post the specs when they are finalized.
Almost home....
http://groups.msn.com/Steves65Mustang22Restoration/fewupdatedphotos.msnw