The fabrication for the most part is done on this thing It going to relocate the MAF/filter where the smog pump used to be. Should get that crap out of sight and clean up the engine bay a lot! I'm going to smooth is all out and paint it a gloss black probably. Its held in place about 1/4" from the alt by a steel rod that goes down to the block then is bolted on. 3" pipe all the way with smooth flowing bends in it as you can see. If anyone wants me to make one for them, PM me and I'll see what we can work out. I'll have finished pictures of it tomorrow probably because I'll have to let the paint dry.