Some may remember the first half of my floor installation:
http://forums.stangnet.com/showthread.php?t=559685
Here are the finished pics of the driver side. Well, finished install, still need to do some more welding, grinding, sandblasting, etc. I thought it would be easier but a lot things popped up that made it equally as time-consuming as the passenger side. I actually completed this about a month ago but we moved to a new house (with a big shop!) so that has slowed my progress down to almost a stop while I get the new place up to speed with 220-amp outlets and stuff. Total estimated install time for driver side: 24-30 hours. Total for entire floor: 70-80 hours.
Anyway, here are the pics of the new pan and support and torque box:
View attachment 506529
View attachment 506531
View attachment 506533
View attachment 506535
View attachment 506537
View attachment 506539
View attachment 506541
View attachment 506543
View attachment 506545
View attachment 506547
http://forums.stangnet.com/showthread.php?t=559685
Here are the finished pics of the driver side. Well, finished install, still need to do some more welding, grinding, sandblasting, etc. I thought it would be easier but a lot things popped up that made it equally as time-consuming as the passenger side. I actually completed this about a month ago but we moved to a new house (with a big shop!) so that has slowed my progress down to almost a stop while I get the new place up to speed with 220-amp outlets and stuff. Total estimated install time for driver side: 24-30 hours. Total for entire floor: 70-80 hours.
Anyway, here are the pics of the new pan and support and torque box:
View attachment 506529
View attachment 506531
View attachment 506533
View attachment 506535
View attachment 506537
View attachment 506539
View attachment 506541
View attachment 506543
View attachment 506545
View attachment 506547