Almost done.
I have to finish fabricating the bypass valve piping and the engine vent system.
I am ditching the factory coolant recovery tank and relocating the power train control module.
In the near future the battery is going to the trunk also.
Hopefully fire it this weekend.
I have to finish fabricating the bypass valve piping and the engine vent system.
I am ditching the factory coolant recovery tank and relocating the power train control module.
In the near future the battery is going to the trunk also.
Hopefully fire it this weekend.