I Posted a couple weeks ago about my project and ambitions and now i have some updates...
1. The HP stage 1 is being sent out next week to coating and that should take ~5days.
2. Im no longer getting the Boss 302 because of availability, going with a Dart Block..that should be done next week aswell i believe.
3. in progress of installing my new MM control arms and reassembling the transmission(seperated the halfs)...steeda triax and frpp steel bearing retainer.
4. Prepping engine bay for paint and still contemplating the whole car being sprayed.
-Im also thinking about an aem engine management.. pricey but i can get ~40% discount
.
Here's my original thread.
1. The HP stage 1 is being sent out next week to coating and that should take ~5days.
2. Im no longer getting the Boss 302 because of availability, going with a Dart Block..that should be done next week aswell i believe.
3. in progress of installing my new MM control arms and reassembling the transmission(seperated the halfs)...steeda triax and frpp steel bearing retainer.
4. Prepping engine bay for paint and still contemplating the whole car being sprayed.
-Im also thinking about an aem engine management.. pricey but i can get ~40% discount
.
Here's my original thread.