Raise the roof.

To answer the Kartheif's question, yes, they poured new footings but just on the perimeter. Not sure if they do so on the rest. I forgot to ask when the project manager was here. They have rebar at the corners they they will tie in with concrete columns.
 

Attachments

  • IMG_20220430_122043346.webp
    IMG_20220430_122043346.webp
    509.3 KB · Views: 10
  • IMG_20220430_122047276.webp
    IMG_20220430_122047276.webp
    248.2 KB · Views: 9
  • IMG_20220430_122052579.webp
    IMG_20220430_122052579.webp
    247.7 KB · Views: 8
  • IMG_20220430_122220689.webp
    IMG_20220430_122220689.webp
    424.6 KB · Views: 7
This the block they will use to close it all in. Things are going by slowly now so they will probably be in the yard a month. I'm a little worried about the power lines. The peak is less than 18 feet from the top power lines. That is against code. We shall see.
 

Attachments

  • IMG_20220430_122134533.webp
    IMG_20220430_122134533.webp
    607.3 KB · Views: 6
  • IMG_20220430_122144584.webp
    IMG_20220430_122144584.webp
    762.7 KB · Views: 6
  • IMG_20220430_122332622.webp
    IMG_20220430_122332622.webp
    236.2 KB · Views: 6
Some other worries. My carport cracked. I did address this. He is supposed to send the engineer out to take a look. Also, on my porch, the anchors have rusted away. Will probably have to have them replaced.
 

Attachments

  • IMG_20220430_122959486.webp
    IMG_20220430_122959486.webp
    181.4 KB · Views: 8
  • IMG_20220430_123005139.webp
    IMG_20220430_123005139.webp
    159.8 KB · Views: 8
  • IMG_20220430_122253481.webp
    IMG_20220430_122253481.webp
    550.8 KB · Views: 8
  • IMG_20220430_122250611.webp
    IMG_20220430_122250611.webp
    328.4 KB · Views: 8
They are almost finished blocking in the perimeter. The porch post still need to be finished along with the second carport support posts. I need to get with them to determine how that will be done. I think next is the permanent steps and then the driveway to the carport last.
 

Attachments

  • IMG_20220508_082817968.webp
    IMG_20220508_082817968.webp
    650.6 KB · Views: 9
  • IMG_20220508_082713090.webp
    IMG_20220508_082713090.webp
    466.8 KB · Views: 9
  • IMG_20220508_082732696.webp
    IMG_20220508_082732696.webp
    521.8 KB · Views: 11
  • IMG_20220508_082749563.webp
    IMG_20220508_082749563.webp
    675.6 KB · Views: 11
  • IMG_20220508_082806941.webp
    IMG_20220508_082806941.webp
    556 KB · Views: 9
  • IMG_20220508_082845754.webp
    IMG_20220508_082845754.webp
    481.8 KB · Views: 8
  • IMG_20220508_082655395.webp
    IMG_20220508_082655395.webp
    677.7 KB · Views: 8
  • IMG_20220508_082644530.webp
    IMG_20220508_082644530.webp
    661.1 KB · Views: 8
  • IMG_20220508_082611901.webp
    IMG_20220508_082611901.webp
    533.2 KB · Views: 8
That came out alot better than I thought it would when you first started out with this project.... Actually looks pretty good.......
That L shaped area is the back of your place?? That would make one amazing deck there......
 
That came out alot better than I thought it would when you first started out with this project.... Actually looks pretty good.......
That L shaped area is the back of your place?? That would make one amazing deck there......
The door in the foreground is the backdoor of my dad's place. It's a mother in-law apt we had built attached to the main house. We are putting a walkway about 4 or 5 feet wide from that door to the carport. I think we have decided to make it the length of the carport so we will have a bbq deck.
 
  • Like
Reactions: Ronin38 and limp
No crew has been out here in two weeks soI called the contractor Friday to ask when he expected them to be back. He said he thought they were supposed to be here they day before so he was going to check with the sub and call me back. I never got a call but bright and early Saturday morning they are under the house with a hammer drill waking up the whole house. Well played, Mr Contractor Man.
 
So they are finally back. While they still have block work to finish, a crew showed this morning to work on the driveway. The contractor is supposed to be here today as well. He was out with COVID for a while. Not much I can say for him is he basically pays lip service to any issues I've had in the past but he did get a crew here when I told him they have only been here 4 hours in the last 3 weeks. The crew that showed up a week ago last Saturday left after lunch.
 
Finally more progress. Proper steps to the front door and new railing for the porch. I really didn't want railing but it's over 3 feet off the ground so it's required. Prepping the driveway for the incline. My guess is the had to dig a footing for support. Also the deck/walkway from my dad's place to our carport so he doesn't have to climb steps.
 

Attachments

  • IMG_20220601_191301285.webp
    IMG_20220601_191301285.webp
    577.8 KB · Views: 3
  • IMG_20220601_191030963.webp
    IMG_20220601_191030963.webp
    660.2 KB · Views: 3
  • IMG_20220601_191025788.webp
    IMG_20220601_191025788.webp
    469.4 KB · Views: 2
  • IMG_20220601_191021689.webp
    IMG_20220601_191021689.webp
    548.4 KB · Views: 2
  • IMG_20220601_190940901.webp
    IMG_20220601_190940901.webp
    380.7 KB · Views: 2
  • IMG_20220601_190924714.webp
    IMG_20220601_190924714.webp
    796.1 KB · Views: 3