Progress Thread Jewel Green street/strip 92 LX progress thread

Alittle more progress today. Intake ports are ported and properly fitted. Not perfect but much better then my earlier post.
Have stainless bolts installed on the front timing cover as well as the balancer and water pump final installed.

Intake still needs alittle plenum clean up.

Pretty close to putting oil in, priming and final install of Intake. Need to clean a few parts up for clear coating, then I can clear coat the intake.

Probably call my dyno guy this week and see what his back log is.


20260801_172056.webp
20260801_172102.webp
20260801_172107.webp
20260801_172159.webp
20260801_172146.webp
 
Last edited: