In an effort to keep motivated and get all the little "crap" taken care of so I can get the interior and paint done by the spring, I ordered a few things:
1. The 13" flowmaster 3" outlet pipe tips.
2. the billet polished water neck
3. 3.12" Vortech pulley (to remove the 3.33" pulley)
WOnt have time to put stuff on until a week from Saturday, then I can finally get with WES and get everything tuned up.
Thanks
RC
1. The 13" flowmaster 3" outlet pipe tips.
2. the billet polished water neck
3. 3.12" Vortech pulley (to remove the 3.33" pulley)
WOnt have time to put stuff on until a week from Saturday, then I can finally get with WES and get everything tuned up.
Thanks
RC
