Build Thread '83 T-top Coupe - Welding Holes in My Rear

Status
Not open for further replies.
As a brief refresher, before:
49763336595__92DC5486-9B3E-4584-99B7-E0280E5BC552.webp

After:
IMG_4191.webp
 
Go ahead and brag why don't ya. SInce you do, I will to. Miss. State go beat to hell in first game of regionals then won 3 straight elimination games to get to Super Regional! Wiped out OU today! #HailState Saturday was awesome with a bottom of the 9th, 2 out, 2 strike 3 run walk off HR to win 3-2 over FSU.
 
Go ahead and brag why don't ya. SInce you do, I will to. Miss. State go beat to hell in first game of regionals then won 3 straight elimination games to get to Super Regional! Wiped out OU today! #HailState Saturday was awesome with a bottom of the 9th, 2 out, 2 strike 3 run walk off HR to win 3-2 over FSU.
lol
 
I brought my floorpan down to the shop.

I thought it was galvanized metal, nope. The manufacturers sprayed a weld through primer all over it.

It said it was made in Taiwan. Suppose they used imported American steel?

So it’s just here to look prettty is all.
20E23505-2328-4E02-8A4E-35C643ACFA99.webp
 
  • Like
Reactions: Bossed and RaggedGT
So....Booger will be rolling out in 3 months... you're the man, Dave. My wife keeps trying to forgo a house with a garage for houses with screened in back porches.... or creeks and bridges in the back yard.
 
  • Like
Reactions: RaggedGT
Three months of work on the car, that’s my well meaning intentions at this moment.

I want to get the engine bay completed, and as a reminder, this is what Booger’s eb looks like right now:
1636FDD3-A2D9-448A-B008-0ED0F762655C.webp

I want to take him from my garage to the paint booth at the end of August to spray the front end. So when I say completed, I mean completed.

Of course the floor pan, sfc’s, etc will be done in that three month period.

I’m going to try and have the eb done in that first month, too optimistic? Idk.
 
Status
Not open for further replies.